Skip to content
WPTN Minn-Dak 2nd Evap Detail Engr - IMG_0027-1

Minn-Dak Farmers Cooperative Second Effect Evaporator Installation

New Second Effect Evaporator Expands Steam Capacity in Factory Upgrade

As part of a phased expansion, a new second effect evaporator was installed at the Wahpeton factory to increase steam capacity and boost plant output. The evaporator, similar in size to a previously installed unit, required additional piping for steam, condensate, juice, and air, as well as new pumps housed in a single-story building addition. Power, instrumentation, and lighting were added to support the system. The project included 3D scanning for accurate modeling, detailed design and engineering, equipment procurement, and on-site construction management, ensuring efficient execution and successful completion.

Location:
Wahpeton, ND

Sector:
Industrial Services:
Food and Beverage

Services:
Engineering