Minn-Dak Farmers Cooperative First Effect Evaporator Installation
Enhanced Evaporator Installation Boosts Factory Throughput and Efficiency
A new 60,000 SF first effect BMA falling film evaporator was installed to increase the capacity of a 9,500 TPD factory's evaporator station. The evaporator, assembled on-site, was placed on a new concrete foundation designed for a potential future enclosure. The project included the installation of recirculation and juice transfer pumps, a 6,886-gallon condensate tank, and supporting structural, mechanical, and electrical systems. 3D modeling and scanning technology were used to ensure accuracy, and power distribution and control systems were integrated. Detailed design, equipment procurement support, and construction management services were provided to ensure successful execution.
Location:
Wahpeton, ND
Sector:
Industrial Services:
Food and Beverage
Services:
Engineering