Skip to content
Angio #2 - Final-9
Angio #2 - Final-11

Banner Thunderbird Medical Center Angiography #2

Renovated IR Lab Boasts LED Lighting and Advanced Equipment

 The project involved renovating the Angio #2 procedural room and replacing existing equipment with a new Philips Azurion 7 C20 system. To improve workflow and efficiency, the dividing wall between Angio #1 and Angio #2 control rooms was removed, creating an open, shared control room. The renovation included new flooring, wall paint, ceilings, LED lighting, and updated HVAC design.

Location:
Glendale, AZ

Size:
872 SF

Sector:
Healthcare 

Services:
Architecture
Engineering